Earthing and Bonding Simulation for Substations, GIS, Industrial and Commercial Installations
Calculation of touch voltage and step voltage during fault conditions as per the following standards
a. IS/IEC 61936-1
b. BS EN 50522
c. IEC 60479-1
Calculation of touch and step voltage due to transfer
potentials.
Simulation of Global earthing system.
Calculation of transfer potentials and transfer fault current.
Actual fault condition while using NGR.
Modelling of EHV, HV and LV electrical systems to study
the effects of any electrical faults.
Soil resistivity analysis such as modelling multi-layer soil
models.
Simulation of stress voltage on the installation and system
EMI and Lightning Study
HV, EHV interference study on pipelines.
EMI/EMC simulation for critical infrastructures.
Study of radiated (electric and magnetic field, coupled currents) and conducted effects from LV, HV and EHV transmission
lines / substation / GIS / cables, etc.
EMF Exposure Assessments for equipment and human safety.
Lightning Simulation for all installations such as pipelines, transmission lines, substation, GIS, bridges, dams, buildings, etc.
Effect of direct and indirect lightning current in the structure/installation